Case Study
Logistics Park
Challenge
Vast, unused roof areas and high electricity bills were hindering our growth.
Our Solution
Installation of PV and implementation of intelligent energy management.
Project Details
The logistics park with its huge roof areas was an ideal candidate for the installation of a photovoltaic power plant. The main challenge was to integrate the PV production with the site's consumption, which included warehouses, cooling boxes, and charging a fleet of electric forklifts. We designed and implemented a 1.2 MWp PV system supplemented by an intelligent consumption management system. This system prioritizes the use of self-generated energy: first for direct consumption, then for charging forklifts, and only the surplus is stored in a battery storage system to cover evening peaks. This maximized the use of own energy and minimized the purchase from the grid.
Key Results
€188,000+
Annual Financial Savings
45%
Reduction in Energy Purchase
210 t/year
CO₂ Emissions Reduction
3.2 years
Return on Investment (ROI)